<<Prev Section 21 - Ailerons Next>>
Section Hours: 9.3 Section Status: In-Work


Page 4
Page 4, Step 1:  Cleco the bottom skin assembly to the spar/main rib assembly and final drill.  Disassemble, debur and dimple.
Page 4, Step 2:  Temporarily rivet the lower skin to the main ribs [they will be drilled out later].
Page 4, Step 3:  Buff the edges of the nose rib flanges.

May 26, 2007:  We did this step during the initial deburring (see page 2, step 1)
Page 4, Step 4:  Cleco the nose ribs to the counterbalance.
Page 4, Step 5:  Cleco the nose skin and top skin assembly to the spar/main rib assembly.
Page 4, Step 6:  Ensure the assembly is flat.
Page 4, Step 7:  Bunches of final drilling...


Home Log By Plans <<Prev Next>>