<<Prev April 1, 2007 Next>>
Hours Today: 0.8 Project Total: 625.5



Just a couple of little misc things today… its springtime so we've been doing a few things around the house this weekend.  Anyway, the plans don't call for it, but I know the rivet holes in the rib for the finger strainer flange need to be final drilled.  So, I went ahead and clecoed the flanges in place & final drilled the flanges with the ribs, and then deburred.

After that, I opened up the bolt attachment holes for the fuel senders with a 13/64 drill bit.  These holes are the correct size for the #8 screws the float type senders use for mounting.  But, our capacitive senders mount with AN3 bolts (which were missing when our senders were delivered... we're still waiting on those :-(  Once the bolt holes were final drilled, I then final drilled the nutplate attachment holes and dimpled them since the sender will need to sit flush against the web of the rib.