Hours Today: 3.1 Project Total: 612.0



(18-2 steps 5 & 6, 18-3 steps 1 & 2, 18-4 step 2):  We clecoed the second tank to the same point as the first.

(18-2 step 5):  I clecoed the fuel drain flange to the bottom of each tank.

(18-3 step 1):  While there's still access to the inside of the tanks I match drilled the skin holes into the J-stiffeners.

(18-4 step 3):  Next I slipped the baffles in and clecoed them in place.  After that, the tank attachment zees were clecoed on.  Now, of course it wasn't until everything was clecloed in place that I realized there was this additional hole between two of the normally spaced rivet holes.  There's a matching hole in the skin, but its only on the lower surface.  A quick check of the rivet assignments and nothing is slated to go in this hole, but it just bothered me... so, I unclecoed the baffle from the second tank and turned it around so this hole would line up with its corresponding hole in the skin.

With the baffles correctly oriented and the zees all in place, I final drilled the zees to the baffles and ribs.

Here are the tanks… with a few clecoes for added weight ;-)  Look a lot like the leading edges don't they.  They're quite a bit different though.  They're not quite as long, they're made out of thicker material, they have a back on them and you can't see the insides of them... but that's for obvious reasons ;-)