| (17-3 step 14): Angela & I riveted the second leading edge to about the same point as the first (instead of finishing the first). We'll finish them up next time. |
(19-2 step 7): I wanted to do one last thing before calling it a night. So, I installed the access hatch doublers.![]() |
| Home | Log By Date | <<Prev | Next>> |