Hours Today: 3.4 Project Total: 403.1



(10-12 step 2):  First up tonight was to relocate the tailcone to a lower level since we'll be putting the top skins on.  After we got that taken care of Angela deburred the small bulkhead frame that'll be where the upper skins terminate at the aft deck.  Then she clecoed it in place and final drilled the common holes.
(10-12 step 3):  While Angela was messing with the frame piece I began fluting the two-holed flanges on the upper bulkheads & frames per the plans.
(10-13 step 2):  Well, Angela wasn't quite done so I decided to move ahead a bit.  We still needed to fabricate the up elevator stop so that's what I did.  Here I'm drilling one of the five 1/8" holes in the finished piece which is made out of 1/8"x3/4"x3/4" 6061-T6 aluminum angle.

(10-12 steps 4, 5 & 7):  While I was finishing up the up elevator stop Angela slid the 3 remaining stiffeners into their respective slots in the upper portions of the bulkhead frames.  We then worked on clecoing the two upper skins in place.  These are relatively stiff so at times it took 2 of us to get the holes lined up and get a cleco in.  According to the plans we were supposed to match drill the stiffeners after the rear skin was on but before the front one went on.  Oh well... guess we missed that.  It's too late tonight, we're going to bed.  I don't think we'll have a problem with it next time though.





Home Log By Date <<Prev Next>>