<<Prev September 7, 2006 Next>>
Hours Today: 2.8 Project Total: 377.9



(10-8 step 1):  Well, there was a football game on tonight so I sort of half worked on the plane and half watched the game.  Anyway, knowing that the relatively tight turn at the lower corners of the tailcone (where the bottom skin & side skins meet) were showing some signs of bumps where the bulkheads were, I wanted to try the same technique we used on the horizontal stabilizer nose ribs to help alleviate it.  So, I ground a bit of the flange edges down and then filed them smooth and deburred them.  I also rounded the flanges a bit to more match the skin shape.  It was definitely a trial and error process, but turned out quite well.  Interestingly enough, the smaller F-1012 bulkhead required even less massaging.

Here the F-1011 & F-1012 bulkheads are shown clecoed in.  There are a lot of pieces and layers of aluminum to cleco through in a couple of places when putting these in so it isn't simply a 'just cleco it in there' task.



Home Log By Date <<Prev Next>>