<<Prev August 14, 2006 Next>>
Hours Today: 2.1 Project Total: 354.8



(9-18 steps 3 & 4):  Tonight I squared away the trim tab hinges.  I still had to match drill one of the hinge halves to the elevator itself.  After that the single hole drilled on the trim tab side of the hinge was used to secure one end of the trim tab.  I held the other end in place and match drilled a hole, clecoed it, and then continued with the other holes in a similar fashion.  After all the holes were drilled and clecoed I gave the tabs a couple of swings to check for any binding.

(9-18 steps 5 & 6):  Next I used the edges of the elevator and the trim tabs to mark the hinges.  They were then uninstalled, the pins removed, and the hinge halves were cut to their final shape. (the pins are not cut because they will be bent and secured along the rear spar later after they are permanantly installed)  I then deburred the edges and then reinstalled them to check the their fit… very nice.